07/04/2008 19:07:18  Temp. 79.9  F Humidity 32  % Wind NNE at 0  mph Barometer 30.106 +  in Rain 0.00  in

24 July
Top of Site


Garvin Mesa Weather


Desert Weyr: Our Farm

Sales List

Black Welsh Mountain Sheep

CMK Arabian Horses

Geese and Chickens

Hops Variety Research Project

Desert Weyr Blog


General Sheep Info

General Horse Info


Personal

Gordon-Van Tine Kit House Restoration

Hummer Information

Ken & Oogie

Colorado House Project

Mount Lamborn Picture Gallery


16870 Garvin Mesa Road
Paonia, CO 81428

(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time

Email at sales@desertweyr.com

June House Project Notes

Pouring the Garage Foundation

It took lots of work to get the garage foundation footers poured.

Concrete Arrives

First load is taken by wheelbarrow to the form and dumped.

First Load

First Load

Many more loads followed until the concrete was done to the point where they could use the truck to pour directly into the form.

More Concrete

More Concrete

The footers are smoothed and finished on top.

Finishing the Surface

To help the concrete settle and the forms release the sides are banged with a hammer.

More Concrete

Deck Foundation

Pouring the piers for the deck.

Deck Piers