09/10/2010 12:42:19  Temp. 65.8  F Humidity 22  % Wind SSW at 6  mph Barometer 30.335 +  in Rain 0.00  in

24 July
Top of Site


Garvin Mesa Weather


Desert Weyr: Our Farm

Sales List

Black Welsh Mountain Sheep

CMK Arabian Horses

Geese and Chickens

Hops Variety Research Project

Desert Weyr Blog

Desert Weyr Cafe Press Shop


General Sheep Info

General Horse Info


Personal

Gordon-Van Tine Kit House Restoration

Hummer Information

Ken & Oogie

Colorado House Project

Mount Lamborn Picture Gallery


16870 Garvin Mesa Road
Paonia, CO 81428

(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time

Email at sales@desertweyr.com

June House Project Notes

Electrical Service

The box for the temporary electrical service is installed and attached to the new garage foundation.

Temporary Electrical

Temporary Electrical

Temporary Electrical

Moving the Power Pole

The old electrical service power pole is now in the middle of the garage. The first task in moving it was to decide where the new pole would go. Since it will be alongside a fence we had to remove part of the wires to give access.

Pole Location

Next task is to dig the hole for the new power pole.

Digging Hole

Digging Hole

Digging Hole

With the pole installed the next step is to dig the trench for the conduit from the pole to the electrical box.

Conduit Trench

Conduit Trench

Conduit Trench

Once the conduit is in place, the wires installed and the trench sealed it's time to connect it.
Connecting and Inspecting

Connecting and Inspecting

The old pole has the transformer removed and will be pulled out.

Old Pole