2 December Update

Shop construction continues. With the first floor walls p and the sheathing mostly done you can start to see where windows will be. This is the view out the front window from the downstairs. We had rain followed by snow so the inside of the shop floor got covered in...

Fencing Progress Too!

The north side elk fence has wire stretched across half the span. From the corner up to the gate in the middle. These pictures were taken before it was stretched tight and wired to the posts. By the end of the day yesterday wire had been hung and stretched on the...

Fast Pace on Shop Construction

The new shop construction is making great strides this week. The second wall went up rapidly on Tuesday.By Wednesday the other walls were up and much of the plywood sheeting was installed. Late Thursday was the start of installing the floor joists for the second...

More Elk Fence Work

Ken started work on the inflow of the ditch. The neighbors cattle make a huge mess and destroy the ditch every summer so we are going to in metal culvert pipes up past the gate where the cattle walk and hope we can prevent the water loss that happens when they smash...

More Elk Fence

We’re continuing to replace the old DOW elk fence around the orchard. L & S Mountain Fence is doing an excellent job for us. They did the elk fence we put around our front pasture and the lower fence around the back cedars pasture so we could safely put the...