Siding & Trim

,

Construction continues! Batts are being added over the siding, door and window trim is being installed, and the flashing for the roof is going up. It needs to be installed before the dormer siding.

The upstairs has been turned into an additional workroom, with saws and all sorts of activity. The entire building is looking really nice! I’m amazed at the level of detail that goes into finishing the siding on the dormers and installing everything properly.