On Thursday, the construction crew got the back section of the shop covered. All of the plywood and underlayment were installed. Things went really fast. The back overhang into the orchard pasture is going to make a nice shelter for sheep in summer.
All the doors and windows arrived on Thursday as well. They will go in soon, once the front porch is covered and the entire building is sheathed.

