I had a bit of a bobble trying to update this blog, so expect a lot of posts all at once today.
The insulation people came back and finished installing the blown-in insulation just as the boom truck was delivering the drywall. Fortunately, the drywall contractor was right on time and moved fast. Upstairs, there are a lot of corners and angles, so it took a while to do, but it’s looking good.
Downstairs, there was too much insulation, and the drywall could not be installed properly. They had to pull some out. It made a huge mess, but Ken cleaned it all up over the weekend. Thanks to Ken, they could start the taping on Monday without wasting time cleaning up cellulose.