Shop and Sign Progress

, ,

The new sign hanger is done. We still have to paint it black, but it’s finished. We’re going to have it welded onto the big elk fence at the corner. It’ll be visible from both sides of the road there.

In shop news, the garage door got installed, and painting is starting inside. Next week, the linoleum upstairs will be installed, and the baseboards will be attached and painted. Shelving will be the next major project.

The new farm sign is ready except for paint.
The garage door is finally installed in the shop.