The snow just keeps on coming! The driveway was still covered in snow after Ken plowed it for hours! We’ve got a good two feet or more on the flats, a lot more in drifts, and even the main hay barn has snow where the wind has blown it in. It’s been cold, so the… Continue reading
The roof got underway this past week. It started to snow again and got slippery, so the crew had to quit partway through, but we did get the north side upper sections done. All we need is two good weather days, and it’ll be finished! Continue reading
Construction continues! Batts are being added over the siding, door and window trim is being installed, and the flashing for the roof is going up. It needs to be installed before the dormer siding. The upstairs has been turned into an additional workroom, with saws and all sorts of activity. The entire building looks really… Continue reading
Construction is proceeding at a rapid pace. The rest of the windows and doors were installed today. The stairs were also roughed in, and we can easily get up and down to appreciate the views from the second floor. I definitely prefer going up the stairs in comparison to the ladder! The siding’s been delivered,… Continue reading
Today, the crew finished the exterior framing, framed where the stairs are going to be, and put Tyvek on the west side of the building. Tomorrow, more windows will be going in, and Tyvek installation will continue. Continue reading
We made major progress today. The front porch is now covered, and the Tyvek has been started. What’s even more exciting is that the first two windows are in. Next up is framing and putting in the stairs, then the rest of the doors and windows. Continue reading
It’s winter again. Our January thaw has officially ended. We got between eight and ten inches of snow last night! Today is the day to put the backup rams in with the ewes. So, Ken had to shovel a path to open the ram pen gate. I was able to catch both boys fairly easily,… Continue reading
The big storm predicted for western Colorado has, so far, only sent us rain. It’s created a huge mess. Right now it’s raining over the frozen ground, and once it does cool off and freeze, the driveways are going to be one solid sheet of ice. The worst part is that the snow pack is… Continue reading
On Thursday, the construction crew got the back section of the shop covered. All of the plywood and underlayment were installed. Things went really fast. The back overhang into the orchard pasture is going to make a nice shelter for sheep in summer. All the doors and windows arrived on Thursday as well. They will… Continue reading
Yesterday, we got all the ewes sorted into their secondary breeding groups. We also got their fall/winter worming done. We have to deworm with ivermectin drench after a hard freeze to kill the nose bots that infest the sheep. Well, we had a cold snap, then warm weather, and there was a hatch of flies,… Continue reading