Ken started work on the inflow of the ditch. The neighbors cattle make a huge mess and destroy the ditch every summer so we are going to in metal culvert pipes up past the gate where the cattle walk and hope we can prevent the water loss that happens when they smash down the ditch sides.
First task was to dig out and measure the slope for everything.
Enos was back on Sunday and in about 2.5 hours he had cleared the entire north fenceline of rocks, put the loose rocks back on the rock wall and leveled the whole line. He is a very skilled equipment operator. Larry will be back on Monday and can start setting the corner posts of the north line and getting ready to put the line posts in.