On 16 September the big day. Time to get the solar panels on the roof. Our system is designed toa have 5 panels initially but it is set up to take an extra panel if we need it later. First is getting the ropes and ladders set and the safety lines tied onto the truck on the other side of the garage.
Four panels up and installed. Unfortunately one of the panels was defective and so will have to be replaced. So that ended work on the system for a while.