Shop construction continues. With the first-floor walls up and the sheathing mostly done, you can start to see where the windows will be. We had rain followed by snow, so the inside of the shop floor got covered in thick ice. We helped remove it so the floor could dry and be safe to work on. All of the floor joists are in place now, too.

An opening in the shop wall frames a view out a future window.
This is the view out of the front window from downstairs.
Walls and floor joists are up in the new shop.
The floor joists for the second floor are in place, so the second floor can go in soon.